Gold Member Since 2016
Audited Supplier
Zhangjiagang Fosun Safety Equipment Co., Ltd.

Alloy Steel, Hardware, Carabiner manufacturer / supplier in China, offering Carabiner for Climbing and Emergency Rescue Ds21-2, Wholesale High Quality Silver Metal Lobster Claw Snap Hook for Lanyards, Galvanized Steel D Ring Belt Buckle and so on.

(/ )

Supplier Homepage Product Carabiners Carabiner for Climbing and Emergency Rescue Ds21-2

Carabiner for Climbing and Emergency Rescue Ds21-2

Purchase Qty.:
(Pieces)
1,000-9,999 10,000+
FOB Unit Price: US $2.6 US $2.3
Purchase Qty. (Pieces) FOB Unit Price
1,000-9,999 US $2.6
10,000+ US $2.3
Get Latest Price
Port: Shanghai, China
Production Capacity: 50000PCS/Year
Payment Terms: L/C, T/T, Western Union, Paypal

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: Double Locking Carabiner DS21-2
  • Type: Hook
  • Usage: Industrial and Household
  • Condition: New
  • Step: Two Steps Self-Locking
  • Laser Marking: Available
  • Finished: Yellow/White Zinc Plating
  • Trademark: Fosun
  • Specification: CE/ISO
  • HS Code: 8308100000
  • Material: Metal
  • Shape: D Shape
  • Brand: Fosun
  • Color: White/Yellow Zinc Plating
  • Opening Gate: 22mm
  • Max Breaking Load: 5000lbs/22.2kn
  • Forged Marking: Available
  • Transport Package: Carton and Pallet
  • Origin: Zhangjiagang, Jiangsu, China
Product Description
Cold formed Steel Swivel Carabiner
Specifications:
DS21-2 Kwiklock Carabiner
Cold formed Steel
100% proof loaded to 3600 lbs(16kN)
Min tensile strength 10000 lbs(45kN)
Min gate strength 3600 lbs(16kN)
Min side load strength 3600 lbs(16kN)
Captive Bar Available
Meets Or Exceeds:
ANSI/ASSE Z359.12-2009
CSA Z259.12-11
NFPA 1983-2006
EN362-2004
Weight:282gm

MINIMUM REQUIREMENTS AS OUTLINED FOR HOOKS AND CARABINERS PER STANDARD
StandardCSA Z259.12-01CSA Z259.12-11ANSI Z359.12-1999ANSI/ASSE Z359.1-2009EN 362:2004NFPA 1983-2006
Major Axis5000 lbs(22.2kN)5000 lbs(22.2kN)5000 lbs(22.2kN)5000 lbs(22.2kN)4500 lbs(20kN)***
Gate Face220 lbs(1kN)3600 lbs(16kN)220 lbs(1kN)3600 lbs(16kN)220 lbs(1kN)N/A
Side Load350 lbs(1.55kN)3600 lbs(16kN)350 lbs(1.55kN)3600 lbs(16kN)350 lbs(1.55kN)N/A
Minor AxisN/A3600 lbs(16kN)*N/A3600 lbs(16kN)******
* New Standard required Minor Axis Loading for connectors with non-integral eyes.
** EN:Basic Connectot 1575 lbs(7kN);Multi Use Connector 3378 lbs(15kN).
*** NFPA:Light Use...Major Axis gate closed 6069 lbs(23kN);Major Axis gate open 1574 lbs(7kN)
                  General Use...Major Axis gate closed 8922 lbs (39.7kN); Major Axis gate open 2473 lbs(11kN);Minor Axis 2473 lbs(11kN)

Our Advantage   
1,10 years of rich experience in forging and production.
2,Using high quality materials, first-class equipment.
3,Stable products supply, good quality control and advanced technology.
4, Mark as customer's request, like customer's Company LOGO
5,Competitive factory price.
6,Free samples, you only pay the shipment charge.
7,Strict inspection before shipping.
8,Welcome customer's designs, OEM and ODM items.
9,On time delivery. 
10,Good warranty and after-sales service.
 
Do you offer samples?
Yes, all products are available provided as samples for you to confirm the quality and color.
 
Do you accept sample order or small order?
Yes, we supply sample order for customer as well.
 
Can we have our logo on the product?
Absolutely! As long as ordered quantity meets our m.o.q and provide us with your drawing, we are able to place your logo on the product.
 
Can you help customer to design their own products?
Yes, Not only customize works, we also help you create special design products according to your needs. However you need to provide us the details. We will offer you samples before order confirmed.
 
What is the process of ordering and cooperating with your company?
1, Search for the products you prefer
2, Solve problems and confirm the products
3, Quote the selected products
4, Types of payment
5, Delivery method
6, After-sale service
 
How long will we receive the goods?
Basically, we do not have any stock in our warehouse, the products we offer to you are all-new. As you know , Products stored in the warehouse for a long time will not only lose the luster of the product itself, but also affect the use of the term. Therefore, according to our company policy, we usually start to arrange the production after order confirmed. The delivery time is normally 20-45 days after receiving down payment and also depend on the quantity.
Send your message to this supplier
Avatar
Ms. Anna
Assistant Manager
*From:
To: Ms. Anna
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category